Week 43 – Traditional Tudor Style build photo diary
Show Office Build DiaryThe fireplace hearth is prepared. The new Jotul woodburner is installed – in a contemporary cream finish
The fireplace hearth is prepared. The new Jotul woodburner is installed – in a contemporary cream finish
The platform is being prepared for the rear decking area. The decking area will extend over some of the steps to the basement entrance.
External works continue to the rear of the house Access panels are provided
The final external works are underway. The patio slabs are being laid.
The basement stairs are being fixed into position.
The oak staircase for the Ground Floor to First Floor is being fixed into position. This oak and glass staircase will become a contemporary and eye-catching feature of the hallway.
We are delighted to be shortlisted as a finalist in the South East LABC Building Excellence Awards in the category of Best Individual New Home. The timber frame home shortlisted is a Georgian inspired design that has a classical outward appearance with sliding sash windows and porch with columns, but a contemporary internal layout […]
The stairs from the Ground Floor to the basement are being fixed into position.
The ground floor is being prepared for tiling. Ditra matting is a polyethylene membrane specially designed for tile and natural stone installations. Ditra matting is used so that any movement in the concrete or screed will not affect the tiles. The floor tiling is underway. Internal doors and handles are fitted. The main entrance […]
The new Show Office will have a large basement. This will be used for an exhibition area, meeting room and storage facilities. The studwork for the internal walls has been erected. The metal furring ceiling has been fixed. The full heat recovery system ducting has been installed – we are ready for […]