![Week 43 – Traditional Tudor Style build photo diary Woodburner22806](https://www.scandia-hus.co.uk/wp-content/uploads/Woodburner22806-100x100.jpg)
Week 43 – Traditional Tudor Style build photo diary
Show Office Build DiaryThe fireplace hearth is prepared. The new Jotul woodburner is installed – in a contemporary cream finish
The fireplace hearth is prepared. The new Jotul woodburner is installed – in a contemporary cream finish
The platform is being prepared for the rear decking area. The decking area will extend over some of the steps to the basement entrance.
External works continue to the rear of the house Access panels are provided
Shelving is built for the office storage. Doors fitted
The final external works are underway. The patio slabs are being laid.
The basement stairs are being fixed into position. The kitchen units are being fitted.
The oak staircase for the Ground Floor to First Floor is being fixed into position. This oak and glass staircase will become a contemporary and eye-catching feature of the hallway.
The tiler returns to site to grout the cloakroom tiles.
The stairs from the Ground Floor to the basement are being fixed into position.
The ground floor is being prepared for tiling. Ditra matting is a polyethylene membrane specially designed for tile and natural stone installations. Ditra matting is used so that any movement in the concrete or screed will not affect the tiles. The floor tiling is underway. Internal doors and handles are fitted. The main entrance […]