![Self Build Home Diary – 3 Beam Block Floor](https://www.scandia-hus.co.uk/wp-content/uploads/12-Block-Beam-5-002-100x100.jpg)
Self Build Home Diary – 3
Self Build Home DiaryThe beam and block floor has been finished atop the foundations and the block upstand built for the timber frame to be erected. The scaffolding will be put up shortly in anticipation of the shell arrival next week. The timber frames will be assembled simultaneously across both sites.